"PRIDNIPROVSKA BIOTES", TOKMAKGeneral contractor. Turnkey construction of a combined heat and power plant with an electric capacity of 8.6 MW using biofuel (wood chips). | TOV "SIVERSKA TES" SLAVUTICHGeneral contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant (CHP) with an electric capacity of 12.5 MW on biofuel (wood chips). |
---|