INDUSTRIES:

Dismantling operations of drying lines and pulp granulation on Kirnasovskiy sugar mill

Dismantling operations of drying lines and pulp granulation on Kirnasovskiy sugar mill

Project structure: Completion of the work on dismantling of pulp drying set equipment on Kirnasivka sugar mill and transportation to Radehian sugar Khorostkovskiy unit “OOO” (limited liability company).

LLC "Food company "Zoria Podillia"

LLC "Food company "Zoria Podillia"

Installation of the pulp drying line №2, installation works on the dry pulp granulation line №1,2

FACTORY OF MDF PLATES KOROSTEN ZHITOMIR REGION.

FACTORY OF MDF PLATES KOROSTEN ZHITOMIR REGION.

Stroitel'stvo TETS s ustanovkoy kotla utilizatora firmy Buttner moshchnost'yu R=75 MVt 81/5000 Construction of a CHP with the installation of a Buttner waste heat boiler with a capacity of P = 75 MW

DOK "KALEVALA" PETROZAVODSK. KARELIA

DOK "KALEVALA" PETROZAVODSK. KARELIA

Construction of a CHP with installation of a Buttner waste heat boiler with a capacity of P = 50 MW on wood waste.

TOV "BIOTES" RAKHOV

TOV "BIOTES" RAKHOV

Turnkey construction of Bio TPP with installation of a steam boiler unit HURST BOILER 32 tons of steam / hour (fuel chips) and a turbine unit Р = 6 MW.

"IGOREVSKY DOK" ZD MDF PLIT  IGOREVSKAYA

"IGOREVSKY DOK" ZD MDF PLIT IGOREVSKAYA

Construction of a CHP with the installation of a Buttner waste heat boiler with a capacity of P = 75 MW on wood waste.

DTEK "BURSHTYN CHPP"  BURSHTYN

DTEK "BURSHTYN CHPP"  BURSHTYN

Repair of the drum of the mill Ш0-50А with complete replacement of the cylindrical and end armor of the power block st. No. 10.

CHERNIGOV CHPP  CHERNIGOV

CHERNIGOV CHPP  CHERNIGOV

Repair of steam boilers BKZ-210-140 PT st № 2; 3; 4

PAT "CHERKASSKOE KHIMVOLOKNO CHERKASSKAYA CHPP" CHERKASSY

PAT "CHERKASSKOE KHIMVOLOKNO CHERKASSKAYA CHPP" CHERKASSY

Overhaul of steam boilers BKZ-220-110 st. № 5; 6; 7; With full or partial replacement of the pipe part.

LLC "TOMLESDREV" CHIPBOARD PLANT TOMSK

LLC "TOMLESDREV" CHIPBOARD PLANT TOMSK

Construction of a CHP with the installation of a Dieffenbacher waste heat boiler with a capacity of P = 50 MW on wood waste to generate heat.

PAT "KYIVENERGO" CHP-5, CHP-6

PAT "KYIVENERGO" CHP-5, CHP-6

Reconstruction of network pipelines of communication of blocks № 3, № 4 Overhaul of heating systems with replacement of valves

ELETSKY SUGAR PLANT

ELETSKY SUGAR PLANT

Construction of a CHPP with the installation of a steam boiler 130 t / h and a 13.6 MW turbine unit

"PDK APSHERONSK" ZD MDF GAPSHERONSK

"PDK APSHERONSK" ZD MDF GAPSHERONSK

Installation of technological equipment and metal

"DOK KALEVALA" MDF PLATE PLANT ARK KARELIA

"DOK KALEVALA" MDF PLATE PLANT ARK KARELIA

Installation of technological equipment and metal.

KOROSTEN FACTORY OF MDF PANELS KOROSTEN

KOROSTEN FACTORY OF MDF PANELS KOROSTEN

Installation of equipment and iron and steel departments: debarking, preparation of raw materials, refiner, fiber dryer, forming press line, laminating, cooling

LLC "TOMLESDREV" CHIPBOARD PLANT TOMSK

LLC "TOMLESDREV" CHIPBOARD PLANT TOMSK

nstallation of equipment and turnkey m / c Energocenter (as part of a chip boiler P = 60 MW), drum fiber dryer, lamination line.

"IGOREVSKY DOK" FACTORY OF MDF PLATES.  IGOREVSKAYA

"IGOREVSKY DOK" FACTORY OF MDF PLATES.  IGOREVSKAYA

Installation of equipment and a turnkey m / c of the Energocenter (as part of a chip boiler P = 75 MW), multicyclones, fiber dryers.

"LLC KIROVOGRADOLIYA" OIL FAT FACTORY KIROVOGRAD

"LLC KIROVOGRADOLIYA" OIL FAT FACTORY KIROVOGRAD

CONSTRUCTION OF AN INDUSTRIAL CHPP ON THE BIOMASS LUZGA SUNFLOWER AT THE MEP

OJSC "VINNITSKY MZhK" VINNITSA

OJSC "VINNITSKY MZhK" VINNITSA

CONSTRUCTION OF A BOILER ROOM WITH INSTALLATION OF ENERGY BOILER E-16-3.9-360D ON BIOFUEL (LUZGE)

DESIGN AND INSTALLATION OF A STEAM BOILER

DESIGN AND INSTALLATION OF A STEAM BOILER

DESIGN AND INSTALLATION OF STEAM BOILER 16 T STEAM HOURS (FUEL - SUNFLOWER HALF)