CONSTRUCTION OF AN INDUSTRIAL CHPP ON THE BIOMASS LUZGA SUNFLOWER AT THE MEP
Kirovograd, Ukraine
COMPOSITION OF THE PROJECT
-
Development of design and engineering documentation;
-
Execution of the construction part;
-
Delivery of 3 boilers;
-
Building installation;
-
Installation of 3 boilers E-16-3.9-360 D of total steam production. 48 t;
-
Installation of HVO systems of ash removal and gas cleaning;
-
Installation of an electrostatic precipitator;
-
Installation of a 2.5 MW backpressure turbine;
-
Commissioning and commissioning;
All work was carried out on its own, with the exception of the construction part (subcontractor).
PROJECT DETAILS
-
Customer : Kirovogradoliya LLC
-
Date : 2007-2009
-
Completed works : General contract
"LLC KIROVOGRADOLIYA" OIL FAT FACTORY