PROJECT COMPOSITION
Installation of the pulp drying line №2
-
Gas burner revision and repair;
-
Mixing chamber production according to the project;
-
Production and installation of the mixing chamber with the download tray;
-
Installation and centering of the drum;
-
Repair, installation and painting of the unload chamber complete set, including white wheel and chamber casing;
-
Smoke extractor installation;
-
Production and installation of gas ducts from the unload chamber to the smoke extractor, from the smoke extractor to the cyclones, from the cyclones to the tube;
Cyclones installation.
Installation works on the dry pulp granulation line №1,2
-
Granulator installation;
-
Faucet auger installation;
-
Dispenser auger installation;
-
Cooling column installation;
-
Scraper conveyor installation;
-
Granular pulp noria installation;
-
Granular pulp sifter installation;
-
Air cooling cyclone installation;
-
Cyclone rotary valve installation and self-flowing dust to the dust noria production and installation;
-
Fan installation, air outlet ducts outward production and installation.
PROJECT DETAILS
Customer: LLC «Food company «Zoria Podillia» (OJSC «Haisyn sugar plant», Vinnytsia, Ukraine
Date: 2020
Work performed: main contractor