JSC "AMK" ALCHEVSK STEEL WORKS ALCHEVSK
Short description :
-
Installation of pipelines of the air separation unit VRU-60 Air Liquide No. 8
-
Manufacturing and installation of a metal chimney in a metal frame with a height of H = 100m
-
Installation of pipelines for the reverse cycle of water supply STAN-2000
-
Repair of a tower cooling tower F = 1000 m 2
PROJECT DETAILS
-
Customer : JSC "AMK", Alchevsk, Lugansk region.
-
Date : 2006-2010
-
Completed work : construction and installation work of technological equipment, pipelines, m / c air separation unit (cold block).