JSC "DMK" Dneprodzherzhinsk Ukraine

JSC "DMK" Dneprodzherzhinsk Ukraine

Construction of an oxygen compressor shop with the installation of a block (ASU) AKar-40/35

OJSC "AMK" ALCHEVSK STEEL WORKS, ALCHEVSK

OJSC "AMK" ALCHEVSK STEEL WORKS, ALCHEVSK

СМР технологического оборудования, трубопроводов, м/к воздухоразделительной установки ВРУ-60 Air Liquide №8.

Makeevka Metallurgical Plant (MMK), Makeevka

Makeevka Metallurgical Plant (MMK), Makeevka

Blast furnace # 1 overhaul.

Construction of an oxygen compressor shop with the installation of an AKar-40 / 35-4 unit (ASU) at O

Construction of an oxygen compressor shop with the installation of an AKar-40 / 35-4 unit (ASU) at O

OJSC "Dneprovsky Met. F.E.Dzerzhinsky Combine ”Project Composition Installation of devices ...

Construction of the air separation unit AKar-40 / 35-4 Oxygen station No. 4 at JSC "MMK"

Construction of the air separation unit AKar-40 / 35-4 Oxygen station No. 4 at JSC "MMK"

OJSC "Magnitogorsk Iron and Steel Works" Project structure Installation of technological equipment Installation of technological

LLC "Air Liquide Kstovo" Air separation unit (ASU), Kstovo Nizhny Novgorod region of the Russian Fed

LLC "Air Liquide Kstovo" Air separation unit (ASU), Kstovo Nizhny Novgorod region of the Russian Fed

Brief description: Mounting the evaporator Mounting the liquid nitrogen tank ...