top of page
GROUP OF COPANIES SATER
"Joint Stock Company" SATER "(PJSC" JSC "SATER"), known early as PO “Ukrsakhtekhenergoremont”, created in 1940, has many years of experience of conducting a complex of design, installation, repair and conducting works.
WHAT IS SATER
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
General contract
Turnkey plant construction. A full range of works from design to commissioning.
DESIGNING
Through the use of advanced 3D engineering calculations, the use of advanced equipment and software, our units are able to perform design work of any complexity.
INSTALLATION OF EQUIPMENT
Installation of technological equipment, pipelines of power and enclosing structures.
Construction works
Earthworks, installation of pile foundations, foundations, installation of external and internal engineering networks, construction of industrial buildings and structures.
Manufacturing
Manufacturing of non-standard equipment, heating surfaces and elements of industrial boilers, vessels, power and enclosing structures.
CURRENT PROJECTS
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).
LLC «SIVERSKA TES» SLAVUTYCH
General contractor. Turn-key construction of an energy infrastructure facility - a combined heat and power plant with an electric capacity of 12.5 MW on biofuel (wood chips).
«PRYDNIPROVSKA BIOTES », TOKMAK
General contractor. Turnkey construction of a thermal power plant with an electric capacity of 8.6 MW on biofuel (Pellets from sunflower husk).
LC «RADEHIVSKYI TSUKOR» KHOROSTKIV SUGAR FACTORY
Implementation of our own project in the translation of 4 steam boilers "Radiant" from gaseous fuel to solid fuel (sunflower husk pellets).